| Name |
UnitUnit |
Price, rub without VAT /with VAT |
Price, rub with VAT |
| 5.1.01 Storage - fish products frozen (more than 500 t) |
1t gross/day |
47.65/ 58.13 |
58.13 |
| 5.1.02 Storage - fish products frozen (from 200 to 500 t) |
1t gross/day |
55.17/ 67.31 |
67.31 |
| 5.1.03 Storage - fish products frozen (less than 200 t) |
1t gross/day |
62.69/ 76.48 |
76.48 |
| 5.1.04 Storage - crab, shrimp, scallop |
1t gross/day |
115.39/ 140.78 |
140.78 |
| 5.1.05 Storage - piece freezing fish products |
1t gross/day |
62.69/ 76.48 |
76.48 |
| 5.1.06 Roe frozen storage |
1t gross/day |
112.82/ 137.64 |
137.64 |
| 5.1.07 Storage - salmon salted caviar |
1t gross/day |
194.39/ 237.15 |
237.15 |
| 5.1.08 Storage - fish oil |
1t gross/day |
47.66/ 58.14 |
58.14 |
| 5.1.09 Storage - fish meal |
1t gross/day |
47.66/ 58.14 |
58.14 |
| 5.1.10 Re-freezing (temperature of the received products is higher - 8 degrees Celsius) |
1t gross |
1 401.64/ 1 710.00 |
1 710.00 |
| 5.1.11 Re-freezing (temperature of the received products is from - 8 to -12 degrees Cesius) |
1t gross |
696.72/ 850.00 |
850.00 |
| 5.1.12 Re-freezing (temperature of the received products is from -12 to -18 degrees Cesius) |
1t gross per 1 degree Celsius |
122.95/ 150.00 |
150.00 |
| 5.1.13 Fish products sorting ** |
1t gross |
1 032.79/ 1 260.00 |
1 260.00 |
| 5.1.14 Labeling of fish products ** |
1 bag |
56.56/ 69.00 |
69.00 |
| 5.1.15 Repacking ** |
1t gross |
1 836.07/ 2 240.00 |
2 240.00 |
| 5.1.16 Shtiv by electrocar |
1t gross |
942.62/ 1 150.00 |
1 150.00 |
| 5.1.17 Provision of an inspection room |
24 h |
4 942.62/ 6 030.00 |
6 030.00 |
| 5.2.01 20" container excess storage (from 11 to 15 days) *** |
day |
136.89/ 167.00 |
167.00 |
| 5.2.02 20" container excess storage (from 16th day) *** |
day |
195.08/ 238.00 |
238.00 |
| 5.2.04 40" container excess storage (from 11 to 15 days) *** |
day |
273.77/ 334.00 |
334.00 |
| 5.2.04 40" container excess storage (from 16th day) *** |
day |
389.34/ 475.00 |
475.00 |
| 5.2.05 Daily monitring of a refrigerated container including temperature chart drafting |
day |
5 557.38/ 6 780.00 |
6 780.00 |
| 5.3.01 Responsible storage (outside the temporary storage warehouse area) |
m2/month |
1 081.97/ 1 320.00 |
1 320.00 |
| 5.3.02 Responsible storage (outside the temporary storage warehouse area) |
m2/day |
36.46/ 44.48 |
44.48 |
| 5.3.03 Closed type warehose |
m2/month |
721.31/ 880.00 |
880.00 |
| 5.3.04 Closed warehouse (TSW) |
m2 / per day |
22.79/ 27.80 |
27.80 |
| 5.3.05 In the open area (bonded warehouse) |
m2 / per month |
368.85/ 450.00 |
450.00 |
| 5.3.06 In the open area (bonded warehouse) |
m2 / per day |
11.02/ 13.44 |
13.44 |
| 5.3.07 Storage of floating craft |
m2 / per month |
745.90/ 910.00 |
910.00 |
| 5.3.08 Preparation of the inventory movement report |
1 report |
22.79/ 27.80 |
27.80 |
| 5.3.09 Excessive storage of general cargo (from 11 days) *** |
t, m3/day |
17.39/ 21.21 |
21.21 |
| 5.3.10 Excessive storage of equipment weighing up to 5 tons (from 11 days) *** |
units/day |
360.66/ 440.00 |
440.00 |
| 5.3.11 Excessive storage of equipment weighing over 5.01 tons (from the 11th day) *** |
units/day |
508.20/ 620.00 |
620.00 |