Name |
UnitUnit |
Price, rub without VAT /with VAT |
Price, rub with VAT |
5.1.01 Storage - fish products frozen (more than 500 t) |
1t gross/day |
42.17/ 50.60 |
50.60 |
5.1.02 Storage - fish products frozen (from 200 to 500 t) |
1t gross/day |
48.83/ 58.59 |
58.59 |
5.1.03 Storage - fish products frozen (less than 200 t) |
1t gross/day |
55.48/ 66.57 |
66.57 |
5.1.04 Storage - crab, shrimp, scallop |
1t gross/day |
102.12/ 122.54 |
122.54 |
5.1.05 Storage - piece freezing fish products |
1t gross/day |
55.48/ 66.57 |
66.57 |
5.1.06 Roe frozen storage |
1t gross/day |
99.84/ 119.81 |
119.81 |
5.1.07 Storage - salmon salted caviar |
1t gross/day |
172.03/ 206.43 |
206.43 |
5.1.08 Re-freezing (temperature of the received products is higher - 8 degrees Celsius) |
1t gross |
1 241.67/ 1 490.00 |
1 490.00 |
5.1.09 Re-freezing (temperature of the received products is from - 8 to -12 degrees Cesius) |
1t gross |
616.67/ 740.00 |
740.00 |
5.1.10 Re-freezing (temperature of the received products is from -12 to -18 degrees Cesius) |
1t gross per 1 degree Celsius |
108.33/ 130.00 |
130.00 |
5.1.11 Fish products sorting ** |
1t gross |
916.67/ 1 100.00 |
1 100.00 |
5.1.12 Labeling of fish products ** |
1 bag |
50.00/ 60.00 |
60.00 |
5.1.13 Cargo segregation ** |
1t gross |
916.67/ 1 100.00 |
1 100.00 |
5.1.14 Fish products marking ** |
1 bag |
50.00/ 60.00 |
60.00 |
5.1.15 Repacking ** |
1t gross |
1 625.00/ 1 950.00 |
1 950.00 |
5.1.16 Shtiv by electrocar |
1t gross |
833.33/ 1 000.00 |
1 000.00 |
5.1.17 Provision of an inspection room |
24 h |
4 375.00/ 5 250.00 |
5 250.00 |
5.2.01 20" container excess storage (from 11 to 15 days) *** |
unit |
121.28/ 145.53 |
145.53 |
5.2.02 20" container excess storage (from 16th day) *** |
unit |
172.29/ 206.75 |
206.75 |
5.2.04 40" container excess storage (from 11 to 15 days) *** |
unit |
242.55/ 291.06 |
291.06 |
5.2.04 40" container excess storage (from 16th day) *** |
unit |
344.58/ 413.49 |
413.49 |
5.2.05 Daily monitring of a refrigerated container including temperature chart drafting |
unit/day |
4 916.67/ 5 900.00 |
5 900.00 |
5.3.01 Safe custody |
m2/month |
958.33/ 1 150.00 |
1 150.00 |
5.3.02 Safe custody |
m2/day |
32.27/ 38.72 |
38.72 |
5.3.03 Closed type warehose |
m2/month |
325.00/ 390.00 |
390.00 |
5.3.04 Storage at open area |
m2/month |
641.67/ 770.00 |
770.00 |
5.3.05 Storage at open area |
m2/day |
20.17/ 24.20 |
24.20 |
5.3.06 Floating means storage |
m2/month |
658.33/ 790.00 |
790.00 |
5.3.07 Material assets relocation report |
1 report |
20.17/ 24.20 |
24.20 |
5.3.08 General cargo excess storage (from 10th day) *** |
t, m3/day |
15.38/ 18.46 |
18.46 |
5.3.09 Machinery excess storage (< 5 t) *** |
unit/day |
319.74/ 383.69 |
383.69 |
5.3.10 Machinery excess storage (> 5 t) *** |
unit/day |
447.86/ 537.43 |
537.43 |